Tamko Moisture Guard Plus User Manual

Browse online or download User Manual for For Home Tamko Moisture Guard Plus. TAMKO Moisture Guard Plus User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 3
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
MOISTURE GUARD PLUS
®
Ice & Rain Protective Underlayment
APPLICATION INSTRUCTIONS
Roof
Deck
3-1/2" edge lap
Roof
Deck
MOISTURE GUARD PLUS
UNDERLAYMENT FIELD APPLICATION
VALLEY FLASHING
DETAIL
©
2013 TAMKO Building Products, Inc. TAMKO
®
and MOISTURE GUARD PLUS
®
are a registered trademark of TAMKO Building Products, Inc.
tamko.com
Corporate 220West4thStreet,Joplin,Missouri64801 800-641-4691
CentralDistrict 220West4thStreet,Joplin,Missouri64801 800-641-4691
NortheastDistrict 4500TamkoDrive,Frederick,Maryland21703 800-368-2055
SoutheastDistrict 230035thStreet,Tuscaloosa,Alabama35401 800-228-2656
SouthwestDistrict 7910SouthCentralExpressway,Dallas,Texas75216 800-443-1834
WesternDistrict 5300East43rdAvenue,Denver,Colorado80216 800-530-8868
SURFACE PREPARATION
To begin, remove any dust, dirt, loose nails or other protrusions from the deck of new roofs. Remove all shingles, roong felt, nails, or other
existing roong materials and debris from the deck of existing roofs. Sweep thoroughly to remove any dust and dirt. For best application, apply
MOISTURE GUARD PLUS only in fair weather and when air, substrate, and membrane temperatures are above 35° F.
FOR ROOF DECKS
Apply MOISTURE GUARD PLUS from low to high in shingle fashion as shown below, so that laps will shed water. Overlap edge seams
3-1/2". End seams should be overlapped 6" and staggered. When necessary, the membrane may be unrolled and cut in 10- to 15-foot lengths.
Align the membrane on the lower edge of the roof deck. Remove the release lm from the membrane then press the membrane into place. Roll
lower edges of each course rmly with a wallpaper roller or other hand roller; "Broom in" the installed membrane using an industrial at broom
or squeegee. Bear down on the installed membrane with the broom or squeegee to insure total, even adherence to the substrate. Care should be
taken not to damage the surface when brooming. For ice dam protection, MOISTURE GUARD PLUS must be applied to reach a point above
the highest expected level of ice dams (minimum application at least 24" beyond the interior wall line.)
FOR VALLEYS AND RIDGES
Where necessary, the membrane may be unrolled and cut into 4- to 6-foot lengths. Peel the release lm and center sheet over valley or ridge.
Drape and press sheet into place, working from the center of the valley or ridge outward in each direction. For valleys, apply the membrane
starting at the lowest point and work upward. Overlap all sheets a minimum of 6 inches. The MOISTURE GUARD PLUS underlayment should
be used on "closed valley" applications only. It must be covered by roong materials. MOISTURE GUARD PLUS underlayment must not be
exposed to the elements longer than 90 days before application of the finished roof.
THESE ARE THE APPLICATION INSTRUCTIONS FOR MOISTURE GUARD PLUS UNDERLAYMENT. TAMKO BUILDING
PRODUCTS SHALL NOT BE RESPONSIBLE FOR LEAKS OR OTHER ROOFING PROBLEMS RESULTING FROM FAILURE TO
FOLLOW THESE INSTRUCTIONS. For questions about MOISTURE GUARD PLUS or it's application contact TAMKO's Technical
Services Department at 800-641-4691.
PROVIDE VENTILATION WHEN USING OVER THE ENTIRE ROOF DECK
When using MOISTURE GUARD PLUS underlayment over the entire roof deck the roof must include a system to provide adequate
ventilation for all space immediately below the roof deck. Such ventilation system should be designed in accordance with architectural
design standards appropriate to the size, nature, and location of the structure and should include both ridge and soft venting. For further
information on providing adequate ventilation, contact your architect, building contractor, building materials supplier, or TAMKO.
IMPORTANT:
Tiles can slide during roof loading and until properly fastened. In order to protect MOISTURE GUARD PLUS underlayment
from damage, care must be taken to insure stability of stacked tiles. Fasteners and batten strips must be used when installing
tiles over MOISTURE GUARD PLUS underlayment. TAMKO requires the fastening of every tile in addition to mortar, or
adhesive or foam regardless of the slope. These are TAMKO's minimum requirements. State and local registrations may contain
additional requirements.
SAFETY PRECAUTION
Personal fall protection devices should always be used when applying MOISTURE GUARD PLUS. Moisture, frost or debris may
decrease the traction while walking on MOISTURE GUARD PLUS. PLEASE EXERCISE CAUTION DURING INSTALLATION.
Page view 0
1 2 3

Summary of Contents

Page 1 - MOISTURE GUARD PLUS

MOISTURE GUARD PLUS®Ice & Rain Protective UnderlaymentAPPLICATION INSTRUCTIONSRoofDeck3-1/2" edge lapRoofDeckMOISTURE GUARD PLUSUNDERLAYMENT

Page 2 - WARNING:

MOISTURE GUARD PLUS®Ice & Rain Protective UnderlaymentAPPLICATION INSTRUCTIONS©2013 TAMKO Building Products, Inc. TAMKO® and MOISTURE GUARD PLUS®

Page 3

ADVANTAGES• Mineral surfacing provides enhanced skid resistance.• Strongberglassreinforcementforaddedstabilityduringinstallation.• Flexible

Comments to this Manuals

No comments